19-103 – Senior Advisor

Category:
Engineering
Industry:
Nuclear
Type:
Contract
Location:
Darlington, Ontario
Job ID:
#161973
Recruiter:
Sagar Chatterjee

We are currently requesting resumes for the following position: Senior Advisor

Resume Due Date:  Wednesday, October 16th (5:00PM EST)                                       

Number of Vacancies: 1

Duration: 23 weeks

Location: Darlington

Project Title:  Darlington for the Future

Job Overview

A Senior Advisor is required to assist in providing expertise and insight on outage activities for post-Refurbishment outages such that the total outage duration is reduced from current norms.  This will be through a combination of innovative approaches to the scoping, planning and execution of outage work activities.  Specifically this person must:

  1. Assist in driving project scope and major sub-actions and documenting the activities in a project plan
  2. Assist in identifying the timeline for deliverables
  3. In conjunction with Issue Leads, assist with identifying any additional actions and integrating those actions into the overall project plan
  4. Assist in obtaining commitment of Issue Owners and Leads on project detail and committed schedule dates
  5. Assist in identifying project risks and proposed actions to mitigate risk

 

Qualifications

 

  1. The individual should have been previously licensed as an Authorized Nuclear Operator (ANO), Control Room Shift Supervisor (CRSS) or Shift Manager (SM) at a Nuclear Generating Station.
  2. The Individual should have previous experience in Nuclear Power Plant planned outage execution and an understanding of the outage scoping process, outage planning process and the operational constraints associated with planned outage execution.
  3. The individual should have previous experience in identifying and implementing innovations aimed at gaining efficiency in outage execution or reducing outage duration. The OPG 40 day outage innovation project or the Bruce Power 30 day/30 month outage innovation project are examples.
  4. The individual should be familiar with process or work-face execution improvements implemented at Darlington Refurbishment Guideline Rate